وصف
Crush Shredder Granulator Blades for Plastic Rubber Industry
According to customer’s samples or sample map made to order
We support the recycling industry with efficient blades and systems.
Including but not limited: Fly and Bed Knives,Shredder Blades,Crusher Knife, Cutting Blades etc
2. Granulator knives for the recycling of reusable raw materials (PET, بلاستيك, copper, الألومنيوم, rubber, etc.) into granulate. Product range:rotor and stator knives,fly and dead and bed blades,pelletizer knives, إلخ.
3. Machine Knives for the Tire Industry
We supply standard and custom designs.Our product range for the rubber industry includes: Shear Blades for steelcord and textile made from solid steel and if needed tungsten carbide tipped. Teflon- coated is also possible.Circular Knives and Straight Knives with and without teeth.
Industrial Blades Materia Steel Grade Table | |||||
فئات | الصين(GB/T YB) | Euro(DIN/BS/NF) | American(AISI) | اليابان(JIS) | ISO |
سبيكة أداة فولاذ | 9CrSi | ― | ― | ― | ― |
6CrW2Si | ― | ― | ― | 50WCrV8 | |
Cr12Mo1V1 | 1.2379 | D2 | SKD 11 | X153CrMoV12 | |
Cr12MoV | ― | ― | ― | ― | |
4Cr5MoVSi | 1.2343 | H11 | SKD6 | X37CrMoV5-1 | |
4Cr5W2VSi | 1.2606 | H12 | SKD62 | ― | |
4Cr5MoV1Si | 1.2344 | H13 | SKD 61 | X35CrMoV5-1 | |
متوسط سرعة أداة فولاذ | W18Cr4V | 1.3355 | T1 | SKH2 | HS18-0-1 |
W6Mo5Cr4V2 | 1.3341/1.3343 | M2 | SKH51 | HS6-5-2 | |
W6Mo5Cr4V3 | 1.3344 | M3 | SKH53 | HS6-5-3 | |
W6Mo5Cr4V2Co5 | 1.3243/1.3245 | M35 | SKH55 | HS6-5-2-5 |
صور مفصلة






OUR COMPANY:
We have progressive equipments which from Germany and Japan, independent research and develop department, can produce different kinds of blades as customization. Our goods with high quality, best seller at Southeast Asia, the Middle East, أوروبا, الولايات المتحدة الأمريكية, South America etc.
Our Goal: Be the most professional carbide cutting and slitting knives manufacturer.
التعليمات:
س: هل أنت شركة تجارية أو مصنع ?
س: Where is your factory located?
س: كم من الوقت هو وقت التسليم الخاص بك?
For the non standard which we do not have mold it takes 4 ل 6 weeks when receiving the advance payment.